Scheduling blocks effectively ensures team capacity is allocated appropriately and work is sequenced correctly. This guide covers the full lifecycle of block management.

Creating blocks

Accessing Blocks page

1

Navigate to Blocks

Click “Blocks” in main navigation
2

Select month

Use month navigation to choose planning month
3

Find client

Locate client in list
4

Expand client

Click client row to show their blocks

Adding a block

1

Click Add block

Button in client header or expanded view
2

Choose block type

Select from menu (Design, Development, QA, Deployment)
3

Block created

New block added with default values
4

Configure next

Click block to set details

Block restrictions

Core blocks (single instance):
  • Design
  • Development
  • Deployment
  • Only one per client per month
  • Button disabled if already exists
QA blocks (multi-round):
  • Internal QA Review
  • Internal QA Fixes
  • External QA Fixes
  • Can add multiple rounds
  • Auto-numbered (Round 1, Round 2, etc.)
If you need a second Development block, consider adding it in a different month or splitting the work.

Configuring blocks

Opening configuration

Click on any block to open the configuration dialog:
  • Block details shown
  • Edit fields available
  • Save to apply changes

Setting allocation

Specify hours needed for this work: Hours field:
  • Enter whole or decimal hours
  • Examples: 20, 15.5, 40
  • Converted to minutes internally
  • Shows in schedule as capacity
Guidelines:
  • Design: 10-40 hours typical
  • Development: 20-80 hours typical
  • QA Review: 5-15 hours typical
  • QA Fixes: 5-30 hours typical
  • Deployment: 2-8 hours typical
Base allocations on historical data for similar work. Add buffer for unknowns.

Assigning team members

Select who will do the work: Assignee dropdown:
  • Filtered by work type
  • Shows only relevant team members
  • Designers for Design blocks
  • Developers for Development/Deploy
  • QA or Developers for QA blocks
Assignment benefits:
  • Team member sees block in their schedule
  • Capacity reserved on their calendar
  • They can plan around it
  • Helps prevent over-allocation
Assign blocks early so team members can plan their time. Last-minute assignments create scheduling conflicts.

Scheduling dates

Set when work will happen: Start date:
  • When work should begin
  • Must be within block’s month
  • Can be any day of month
End date:
  • When work should complete
  • Must be after start date
  • Can extend beyond month if needed
What happens:
  • Status changes to “Scheduled”
  • Block appears in assignee’s schedule
  • Capacity distributed across date range
  • Timeline visible to team

Setting status

Update status as work progresses:
StatusWhen to Use
Not ScheduledBlock created but no dates set
ScheduledDates assigned, waiting to start
In ProgressWork has begun
CompletedWork finished
LatePast end date, not complete
Status updates are manual. Update them as work progresses to keep plans current.

Reordering blocks

Why reorder?

Custom ordering helps:
  • Match your workflow
  • Show parallel phases
  • Highlight priorities
  • Improve visual clarity

How to reorder

Within a client’s month:
  • Drag blocks up or down
  • Drop in new position
  • Order saves automatically
  • Only affects display
Default order:
  1. Design
  2. Development
  3. Internal QA Review
  4. Internal QA Fixes
  5. External QA Fixes
  6. Deployment

Reordering strategies

Sequential workflow:
  • Keep default order
  • Shows typical flow
  • Clear progression
Parallel work:
  • Put concurrent phases together
  • Design and Development side-by-side
  • Shows simultaneous work
Priority highlighting:
  • Critical blocks first
  • Helps team focus
  • Draws attention

Editing blocks

What can be edited

After creation, you can update:
  • Allocated hours
  • Assignee
  • Scheduled dates
  • Status
  • Sort order

What cannot be edited

Cannot change:
  • Block type (delete and recreate instead)
  • Client (blocks belong to specific client)
  • Month/year (delete and recreate in different month)
  • Round number (for QA blocks)

Making changes

1

Click block

Opens configuration dialog
2

Update fields

Change allocation, assignee, dates, or status
3

Save

Click Save to apply
4

Changes reflected

Schedule and capacity update immediately

Deleting blocks

When to delete

Remove blocks that are:
  • No longer needed
  • Created by mistake
  • Work cancelled
  • Replaced by different plan

How to delete

1

Find block

Locate in client’s blocks list
2

Click delete

Use delete icon/button
3

Confirm

Confirm deletion in dialog
4

Block removed

Capacity released, schedule updated

What happens when deleted

  • Block removed from all views
  • Capacity released
  • Team member’s schedule updated
  • Time entries remain (not deleted)
  • Cannot be undone
Deleting blocks is permanent. Time already logged is preserved, but the capacity reservation is lost.

Scheduling strategies

Strategy 1: Full planning upfront

Approach:
  • Add all blocks at month start
  • Set all allocations and assignments
  • Schedule full sequence
  • Clear timeline for team
Best for:
  • Predictable projects
  • Fixed-scope work
  • Well-understood phases
  • Teams that plan ahead
Pros:
  • Complete visibility
  • No surprises
  • Team can plan around it
Cons:
  • Less flexible
  • Changes need updates
  • Upfront effort required

Strategy 2: Just-in-time planning

Approach:
  • Add blocks as needed
  • Schedule ~2 weeks ahead
  • Adjust based on reality
  • Flexible allocation
Best for:
  • Uncertain timelines
  • Evolving scope
  • Agile workflows
  • Dynamic teams
Pros:
  • More flexible
  • Based on actual progress
  • Less upfront work
Cons:
  • Less visibility
  • Team has shorter notice
  • Requires active management

Strategy 3: Hybrid approach

Approach:
  • Plan major blocks upfront (Design, Dev)
  • Add QA blocks as needed
  • Schedule firm dates 1-2 weeks ahead
  • Balance planning and flexibility
Best for:
  • Most teams
  • Mix of project and retainer work
  • Moderate predictability
Pros:
  • Good visibility
  • Reasonably flexible
  • Practical balance
Cons:
  • Requires ongoing attention
  • Some updates needed

Month navigation

Viewing different months

Navigate to plan future months:
  • Use month navigation arrows
  • View shows blocks for that month
  • Can add/edit blocks for future
  • Past months read-only for most

Planning ahead

Current month:
  • Execute scheduled blocks
  • Update statuses
  • Log time
Next month:
  • Add blocks
  • Assign team members
  • Set tentative dates
2-3 months out:
  • Create blocks for known work
  • Rough allocations
  • No firm dates yet
Plan at least one month ahead to give team members notice and prevent scheduling conflicts.

Collaboration

Who can manage blocks

Users with permission:
  • Project Managers - Full access
  • CSMs - Full access for their clients
  • Managers - Full access for all clients
  • Delivery Team - View only

Communication

When adding blocks:
  • Consider notifying assignee
  • Explain context if needed
  • Confirm availability
When changing blocks:
  • Update assignee if dates change
  • Explain why if major change
  • Re-confirm if delayed
Status updates:
  • Update promptly
  • Keep team informed
  • Note blockers or delays

Best practices

Plan early

Add blocks at start of month for visibility

Realistic allocations

Don’t underestimate - include buffer time

Assign promptly

Give team members advance notice

Use QA rounds

Add multiple QA blocks if testing will iterate

Sequence logically

Order blocks to match workflow

Update status

Keep status current as work progresses

Communicate changes

Tell team when blocks change

Check capacity

Ensure team members not over-allocated

Review regularly

Check blocks weekly, adjust as needed

Troubleshooting

Core blocks (Design, Development, Deployment) can only be added once per client per month. Check if it already exists. For QA blocks, you can always add another round.
Block must be assigned to them AND have scheduled dates. Configure the block with both assignee and dates.
Ensure you have permission (PM, CSM, or Manager). If block has already been worked on, consider marking complete instead of deleting.
Block types cannot be changed. Delete the incorrect block and create a new one with the right type.
Verify block is assigned to correct person, has dates set, and status is not “completed”. Check they’re looking at the right month.

Next steps